02 Apr MidAmerican Energy Company
MVP 3 and 4 345kV/161kV Transmission Project
Installed 121 miles of double circuit 345kV / 161kV self-weathering steel monopoles including removal of existing 161kV in existing ROW. Installed / Expanded three 345kV Substations including O’Brien, Kossuth, and Webster. Installed 71 miles of MVP 4 transmission line of DC345/ 161kV self-weathering steel monopoles, including removal of existing 161kV transmission line in existing ROW. Includes one 345kV Black Hawk Substation Expansion. Read more